Agrati di Veduggio industrial site revamping

Revamping of the industrial site of Agrati di Veduggio

The project was commissioned to GECOS by Agrati Group and started in March 2016 and was concluded in November 2017.

The objective of the work was to perform an energy audit and subsequent energy efficiency improvement of the productive process at the industrial site of Agrati di Veduggio. The analysis led to a strong reduction in primary energy consumption through an in-deep analysis of single energy consumption components and a multi-target optimization of the whole industrial site. While the main objective was to achieve high relatability and low complexity of the energy distribution network, the results included an optimized heat recovery on multi-temperature levels and the design of the optimal integration with a CCHP engine to provide heat, cooling, and electricity to the industrial site.  

For additional queries and information, please refer to Prof. Stefano Campanari (stefano.campanari@polimi.it).

Leave Comment

Your email address will not be published. Required fields are marked *